• Skip to primary navigation
  • Skip to main content
  • Skip to primary sidebar

All Healthy News

Clean Air. Pure Water. Healthy Home.

HEALTH BEGINS WITH:
Clean Air. Pure Water. Healthy Homes.

  • Home
  • About/Contact
  • HEALTH NEWS/TRENDS
  • CLEAN AIR
  • HEALTHY HOME
  • PURE WATER
  • Free Video Reveals

Seattle DJC.com local business news and data – Construction

February 6, 2023 by Staff Reporter

Seattle DJC.com local business news and data – Construction

February 6, 2023

Best In State: Gold Award
Future Value To The Engineering Profession 

U.S. National Guard photo by Joseph Siemandel

The drill floor of the Thurston County Readiness Center.

P2S Inc.

Project: Thurston County Readiness Center  

Client: Washington Army National Guard 

 

The new Thurston County Readiness Center is a specialized training and emergency response facility serving the Washington National Guard 2nd Battalion, 146th Field Artillery Regiment. The 80,000-square-foot center provides the unit with multiple training areas, maintenance bays, a 6,400-square-foot drill floor, fitness rooms, a state-of-the-art kitchen and dining area, and ample spaces for collaboration and comradery building among the soldiers. 

This building has a widely variable occupant load with around 20 core occupants that use the building as a home base for their office environment, increasing to several hundred during a training event (or if there were to be an actual emergency).  

The P2S engineers carefully considered how all areas of the building would be used while designing dynamic and energy-efficient systems for heating, cooling, water usage, commercial cooking, and emergency systems. This new system also needed to meet or exceed LEED Silver standards.  

The plumbing engineers designed a modular approach to producing hot water. There is a 20- to 30-fold difference between the typical hot water demand and during an “event.” The water heating system uses an array of instantaneous water heaters and a storage tank. This array of instantaneous heaters can simultaneously respond to a low demand for just a few lavatories or a high demand for 20 showers and a commercial kitchen. This engineering approach conserves energy compared to using conventional domestic hot water tanks.

The facility’s mechanical system design incorporates several sustainable features, building on a comprehensive energy life-cycle cost analysis. This HVAC system using variable refrigerant flow (VRF) with energy recovery ventilation can provide a 43% annual cost reduction compared to a baseline building HVAC system.  

Additional sustainable design features for this facility include 30% water savings through low-flow fixtures, and indoor air quality controls that monitor and automatically respond to ensure excellent air quality. Seismic positional retention systems, a backup generator, and a propane utility plant that can synthesize natural gas provide resiliency in the case of an emergency. 

The facility also houses the “Firefinder” radar system — specialized equipment stored in a heated space inside the building’s maintenance area, ventilated by both general exhaust and vehicle exhaust snorkel explicitly designed for the Firefinder equipment area. 

P2S’s systems design exceeded the owner’s goal for a Silver LEED building, while providing a cost-effective solution aligned with the forecasted budgeting. This building represents excellent value to the National Guard, the state of Washington and the taxpayers that provide funding.

Other Stories:



Originally Appeared Here

Filed Under: CLEAN AIR

Primary Sidebar

Reduce 99.9% of airborne SARS-CoV-2 Virus

Vollara ActivePure Technologies


News from the EPA

Clean Air Science Advisers See Gaps in EPA Ozone Policy Draft

Enra Specialist Finance becomes first recipient of new global indoor air quality award – The Intermediary

How To Boil Binchotan Activated Charcoal Sticks For Maximum Purification Benefits

Exploring Delos Air Filtration Systems for Home, Work, and Travel

EPA cites 2 oil and gas firms over Permian Basin pollution – Winnipeg Free Press

Panasonic Earns 2023 ENERGY STAR

Clean Air Engineering-Maritime Earns CARB Approval for Shore-Based System in Ports

Air Duct Cleaning Houston | Professional Services By Speed Dry USA

Clean air advocate and university prof adds voice for incentivizing EVs for Filipinos

Camfil Air Quality Professionals Explain the Role of Air Filters in Reducing Spread of Colds and Airborne Illnesses

Privacy Policy | Terms and Conditions | About/ Contact
Copyright © 2023 · ALL HEALTHY NEWS . Log in